Capability Maturity vs. Work on Proposals: Difference between revisions

From Cibernética Americana
Jump to navigationJump to search
No edit summary
No edit summary
Line 13: Line 13:
</blockquote>
</blockquote>
<li><blockquote>
<li><blockquote>
The second is so-called </html>[[:en:Capability Maturity Model|'''Capability Maturity (CMM)''']] and its [[:en:Antipattern|''antipattern'']] [[:en:Capabilit Immaturity Model|'''CIMM''']] <html>, which has to do with the reliablity of estimates in CMM Level I situations.
The second is so-called </html>[[:en:Capability Maturity Model|'''Capability Maturity (CMM)''']] and its [[:en:Antipattern|''antipattern'']] [[:en:Capabilit Immaturity Model|'''CIMM''']] <html>, which has to do with the reliablity of estimates in CMM Level I or lower situations.
</blockquote>
</blockquote>
<blockquote>
<blockquote>