Capability Maturity vs. Work on Proposals: Difference between revisions
From Cibernética Americana
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 13: | Line 13: | ||
</blockquote> | </blockquote> | ||
<li><blockquote> | <li><blockquote> | ||
The second is so-called </html>[[:en:Capability Maturity Model|'''Capability Maturity (CMM)''']] and its [[:en:Antipattern|''antipattern'']] [[:en: | The second is so-called </html>[[:en:Capability Maturity Model|'''Capability Maturity (CMM)''']] and its [[:en:Antipattern|''antipattern'']] [[:en:Capability Immaturity Model|'''CIMM''']] <html>, which has to do with the reliablity of estimates in CMM Level I or lower situations. | ||
</blockquote> | </blockquote> | ||
<blockquote> | <blockquote> | ||