Capability Maturity vs. Work on Proposals: Difference between revisions
From Cibernética Americana
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 13: | Line 13: | ||
<li><blockquote> | <li><blockquote> | ||
The second is so-called </html>[[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]]<html> CIMM , which has to do with the reliablity of estimates in CMM Level I situations. | The second is so-called </html>[[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]]<html> CIMM , which has to do with the reliablity of estimates in CMM Level I situations. | ||
</blockquote> | |||
<blockquote> | <blockquote> | ||
Of course the lack of adequate requirements and design is the penultimate root cause of failure in software development projects (the ultimate being the universal failure of responsibility). | Of course the lack of adequate requirements and design is the penultimate root cause of failure in software development projects (the ultimate being the universal failure of responsibility). | ||