Capability Maturity vs. Work on Proposals: Difference between revisions

From Cibernética Americana
Jump to navigationJump to search
No edit summary
No edit summary
Line 13: Line 13:
<li><blockquote>
<li><blockquote>
The second is so-called </html>[[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]]<html> CIMM , which has to do with the reliablity of estimates in CMM Level I situations.
The second is so-called </html>[[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]]<html> CIMM , which has to do with the reliablity of estimates in CMM Level I situations.
</blockquote>
<blockquote>
<blockquote>
Of course the lack of adequate requirements and design is the penultimate root cause of failure in software development projects (the ultimate being the universal failure of responsibility).
Of course the lack of adequate requirements and design is the penultimate root cause of failure in software development projects (the ultimate being the universal failure of responsibility).