Capability Maturity vs. Work on Proposals: Difference between revisions
From Cibernética Americana
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
</blockquote> | </blockquote> | ||
<li><blockquote> | <li><blockquote> | ||
The second is so-called [[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]] CIMM , which has to do with the reliablity of estimates in CMM Level I situations. | The second is so-called </html>[[:en:Capability Maturity Model|Capability Maturity (CMM)]] and its [[:en:Antipattern|antipattern]]<html> CIMM , which has to do with the reliablity of estimates in CMM Level I situations. | ||
</blockquote> | </blockquote> |
Revision as of 01:31, 21 January 2011
|