Talk:AKPERSON: Difference between revisions
From Cibernética Americana
Jump to navigationJump to search
m (Protected "Talk:AKPERSON" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))) |
No edit summary |
||
Line 9: | Line 9: | ||
<blockquote> | <blockquote> | ||
Here 'peer' has a special meaning, distinct from a professional peer which covered by Professional Courtesies. It means a developer or enumerated set of them | Here 'peer' has a special meaning, distinct from a professional peer which covered by Professional Courtesies. It means a developer or enumerated set of them | ||
who are the developers of a pkg that is a significant element in my projects. | who are the developers of a pkg that is a significant element in my projects. This entitlement is equivalent to life time F class. | ||
</blockquote> | </blockquote> | ||
* Professional Courtesy | * Professional Courtesy | ||
<blockquote> | |||
This entitlement is basically F class for 90 days. | |||
</blockquote> | |||
* IRC interlocutors | * IRC interlocutors | ||
<blockquote> | |||
Generally S class for a month. | |||
</blockquote> | |||
* Job Clients | * Job Clients | ||
<blockquote> | |||
Generally Y class pre contract and F thereafter for the duration of the engagment. | |||
</blockquote> | |||
[[User:Root|Root]] ([[User talk:Root|talk]]) 03:06, 6 March 2023 (UTC) | [[User:Root|Root]] ([[User talk:Root|talk]]) 03:06, 6 March 2023 (UTC) |
Revision as of 19:16, 5 March 2023
P Class Entitlement
A special class of admission to core domain space whose scope, duration, and levels of entitlement vary.
This is processed with 'waivers' for the users' DS nick @ devops1.sameboat.network.
Covers these special situations
- Peer developer
Here 'peer' has a special meaning, distinct from a professional peer which covered by Professional Courtesies. It means a developer or enumerated set of them who are the developers of a pkg that is a significant element in my projects. This entitlement is equivalent to life time F class.
- Professional Courtesy
This entitlement is basically F class for 90 days.
- IRC interlocutors
Generally S class for a month.
- Job Clients
Generally Y class pre contract and F thereafter for the duration of the engagment.