TASKPM: Difference between revisions
No edit summary |
|||
Line 24: | Line 24: | ||
== Task Coach == | == Task Coach == | ||
A fork of Task Coach 1.4.3 is the | A fork of Task Coach 1.4.3 is the basis of the UI. | ||
== 1.0 Story == | == 1.0 Story == |
Revision as of 09:18, 20 September 2018
'TASKPM' is Task Project Management, a marque designating a service integrating different preexisting products operating on this domain in my tl;dr product line.
Common Domain
A unified abstraction of the Task and Project is the underlying means of unifying the distinct 3rd party products. By Project we basically mean the thing which is the subject of traditional PERT/CPM and by Task we mean the elements of a Project or an idealized To Do list.
Google Calendar
Tasks may flow to and from a Google Calendar and be rescheduling may be attempted there.
MS Project
MS Project 2010 is the baseline of support for the MS product and tasks may flow to or from it.
Task and Time Warrior
Taskwarrior and Time Warrior are supported with the design goal of seamless flow of tasks thru the abstract domain of task tasks and tagged timew intervals.
Task Coach
A fork of Task Coach 1.4.3 is the basis of the UI.
1.0 Story
The above succinctly captures the story. Stipulations on the flows above will be supplied in the build out.