C-Liu: Difference between revisions

From Cibernética Americana
Jump to navigationJump to search
No edit summary
No edit summary
Line 22: Line 22:
  <li>2009-01-11 First 3 production targets [http://staging.lifeline.me Lifeline], [http://publicjobshop.meansofproduction.biz Public Job Shop], and [http://cliu.meansofproduction.biz Token Economy].</li>
  <li>2009-01-11 First 3 production targets [http://staging.lifeline.me Lifeline], [http://publicjobshop.meansofproduction.biz Public Job Shop], and [http://cliu.meansofproduction.biz Token Economy].</li>
  <li>2009-01-19 First version with generic install profile and POOP&sup1; core working and fully vetted modules set for initial release.</li>
  <li>2009-01-19 First version with generic install profile and POOP&sup1; core working and fully vetted modules set for initial release.</li>
  <li>2009-01-dd Social Concrete IOC @ FB.</li>
  <li>2009-01-31 Publish Social Concrete FB App.</li>
</ul>
</ul>
</blockquote>
</blockquote>

Revision as of 01:03, 10 January 2009

C六

 

C-Liu (Liu is 6 in Chinese) is our supported package of PHP code sets centering on a parallelling fork of Drupal 6. Originally we intended it to be based on Concrete5 and Happs in our integrative context (AII), but we have dropped both those packages (C5 and Happs, not Haskell or our AII subproject) but a name is a name so it's retained although its original meaning is now changed to connotate a generic integration point for CMS in PHP focused on social networking.

Primary Goals:

  • Integration point for our PHP code offerings.
  • Basis for LAMP based social networking infrastructure consulting.
  • Target for themes to be produced by CL-XSL.

C六 is the project name. Enterprise specific application will take the name of the business or organization. The exception being Social Concrete which is our packaging of the project as a Facebook app.

Milestones:

  • 2008-09-15 Initial Concept.
  • 2008-09-21 Contextual Concept.
  • 2008-12-15 Drop C5 in favor of Drupal.
  • 2008-12-28 Marshal trunk CMS into a core wireframe wireframe.
  • 2009-01-11 First 3 production targets Lifeline, Public Job Shop, and Token Economy.
  • 2009-01-19 First version with generic install profile and POOP¹ core working and fully vetted modules set for initial release.
  • 2009-01-31 Publish Social Concrete FB App.


¹ Post OOP